Temporary traffic lights, give-and-take and stop/go boards explained
Two-way traffic signals let one direction pass at a time on a single-lane stretch. Multi-way signals do the same at a junction with more than two approaches and can add waiting time.
Give-and-take (priority working) has no lights: drivers on one side give way to oncoming traffic through a narrow gap. Stop/go boards are manned by a worker who turns a sign between Stop and Go.
Convoy working leads a line of vehicles through the works one direction at a time. Contra-flow moves traffic onto the other carriageway, often with a lower speed limit.
A full closure means no through traffic on that road. The notices say which type is planned; they do not say how long you will wait, so allow extra time.
Check your routeRoadworks & closures - England · About our data · How to use
Guides: How to check roadworks on your route · What a road closure or roadworks notice means · Where the roadworks data comes from · Temporary traffic lights, give-and-take and stop/go boards explained · Who to contact about roadworks in England · Full road closure or lane closure: what is the difference?
Notices from official sources only (DfT Street Manager, National Highways), not live traffic. No notice found does not mean there are no roadworks; planned times can change. Contains public sector information licensed under the Open Government Licence v3.0. Maps © OpenStreetMap contributors.